Skip links

Projects

“The Bluebird belongs
to the thrush family (Turdidae). Adult males have thin bills are bright blue on top and somewhat lighter beneath.”
Wikipedia

Current Projects

Oct 2020 – present
Project Manager at NRG, nuclear facility for production of medical isotopes.

Jan. 2017 – present
Associate at DAREL, investigating alternative sources of energy and trying to speed up the energy transition from fossil based to more a more sustainable future.

Occasional
Teacher course ‘Introduction to Offshore Energy’ for IRO.

Past Projects

Nov 2019 – Feb 2020
Tender Manager SPT Offshore (Woerden, NL) for field development in W. Africa on behalf of NewAge, EPCI contract for WHP + pipeline.

April 2018 – Aug. 2019
Project Manager SPT Offshore (Woerden, NL). Preparation of self-installing platform F3Fa for re-use in West Africa from its existing location in the North Sea.

Oct. 2017 –  Feb. 2018   
Director Operations at Dahlman Renewable Technology (Maassluis, NL), part of Synova Power. Development of propriety waste-to-energy plants.

March 2016 – July 2016
The Ocean Cleanup, nonprofit organization for cleaning the oceans of plastics
Project manager for the preparation and installation of the North Sea Prototype, comprising a floating boom of 100 m.

Aug 2015 – Jan 2016
Rijndijk Construction
Project manager for a Waste-To-Energy plant in Dublin (Ir). Steel fabrication in Holland and site project manager for erection of a waste-to-energy plant in Ireland.

Nov 2015
Okeanos
Technical review of a seismic vessel for a British client designed by Rolls Royce, including a visit to RR Norway.

Aug 2014 – Febr 2015
Client: Nordic Yards, Wismar, Germany
Position: Advisor to Transport & Installation department, technical and commercial advise, contract management
Project: Dolwin 3, HVDC station, installation of 2 jackets (5000 t) and float-over operation (20,000t).

Nov 2012 – May 2014
Client: Bluewater Energy Services (Hoofddorp, Aberdeen, Nigg)
Position: Project engineer
Project: Modification of FPSO ‘Haewene Brim’ for Lundin and Shell’s Brynhild tie-in project. Responsible for topsides engineering.

May 2011 – Nov 2012
Client: Argos Terminals BV (Rotterdam)
Position: Project Manager
Project: Project coordination and setting up a project organisation for a newbuild oil terminal for Argos Terminals in Rotterdam.

Febr 2011 – April 2011
Client: Bumi Armada on behalf of Okeanos
Position: Consultant
Project: Technical review of a FPSO project in Vietnam

March 2010 – September 2010
Client: at SPIE Controlec, Schiedam.
Position: Project manager
Part of Shell Prima project, location Europoort, modification of tankpark. EPCM contract management of GTL import facilities comprising basic design, detail design and construction management.

Feb 2010 – April 2010
Client: Okeanos
Position: Technical consultant
Technical Review and report of a new build self-erecting platform project in Canada

Oct 2009 – April 2010
Client: Okeanos
Position: Technical consultant
Assistance to BP Britoil, for tender evaluation of the Quad 204 project, comprising a replacement of the Schiehallion FPSO. Project location KBR in Leatherhead.

Oct 2009
Client: Versatec Energy
Position: Hazop chairman
Hazop on TEG regeneration system for Eneco Gasspeicher EPE project (gas storage in salt caverns) in Gronau, Germany.

April – Oct 2009
Client: SPIE Controlec, Schiedam
Position: Project manager
Basic design of the RotAn pipeline between Rotterdam and Antwerp for Vitol (VTTI) and separate a dedicated extension for Jet Fuel in the Botlek area.

Jan – April 2009
Client: Dockwise Shipping BV
Position: Project engineer
Project: SSFDR Floatovers project
Main project deliverables: project execution plan, quality plan, work descriptions.

October 2008
Client: Bluewater Energy Services BV
Position: Project Engineer Topsides
Project: Ithaca ‘Athena’ field development.
Conversion project for re-deployment of the ‘Uisge Gorm’ FPSO in the North Sea. Project prematurely cancelled due to financial difficulties
Position: Tender concept manager
Project: Deployment of the ‘Uisge Gorm’ in Iran.

Jan – Feb 2008
Client: Okeanos
Position: Technical consultant
Technical review and report on technical risks of a new build FPSO for the North Sea.

May – October 2008
Client: Total E&P NL BV
Position: Project Engineer Topsides
Project: K5F subsea completion
Supervison of installation and (pre-)commissioning of the pipeline installation and platform modifications of K6C and K6N.

March – April 2008
Client: Okeanos
Position: Technical consultant
Technical review and report on technical risks of large new build semi-submersible for the GOM.