Skip links

Projects

“The Bluebird belongs 
to the thrush family (Turdidae). Adult males have thin bills are bright blue on top and somewhat lighter beneath.” Wikipedia

Current Projects

Oct 2020 – present
Project Manager at NRG, nuclear facility for production of medical isotopes.

Jan. 2017 – present
Associate at DAREL, investigating alternative sources of energy and trying to speed up the energy transition from fossil based to more a more sustainable future. ​

Occasional
Teacher course ‘Introduction to Offshore Energy’ for IRO.

Past Projects

Nov. 2019 – Feb. 2020
Tender Manager SPT Offshore (Woerden, NL) for field development in W. Africa on behalf of NewAge, EPCI contract for WHP + pipeline.

April 2018 – Aug. 2019
Project Manager SPT Offshore (Woerden, NL). Preparation of self-installing platform F3Fa for re-use in West Africa from its existing location in the North Sea.

Oct. 2017 – Feb. 2018
Director Operations at Dahlman Renewable Technology (Maassluis, NL), part of Synova Power. Development of propriety waste-to-energy plants.

March 2016 – July 2016
The Ocean Cleanup, nonprofit organization for cleaning the oceans of plastics Project manager for the preparation and installation of the North Sea Prototype, comprising a floating boom of 100 m.

Aug. 2015 – Jan. 2016
Rijndijk Construction, Project manager for a Waste-To-Energy plant in Dublin (Ir). Steel fabrication in Holland and site project manager for erection of a waste-to-energy plant in Ireland.

Nov. 2015
Okeanos, Technical review of a seismic vessel for a British client designed by Rolls Royce.

Aug. 2014 – Feb. 2015
Client: Nordic Yards, Wismar, Germany
Position: Advisor to Transport & Installation department, technical and commercial advise, contract management
Dolwin 3, HVDC station, installation of 2 jackets (5000 t) and float-over operation (20,000t).

Nov. 2012 – May 2014
Client: Bluewater Energy Services (Hoofddorp, Aberdeen, Nigg)
Position: Project engineer
Modification of FPSO ‘Haewene Brim’ for Lundin and Shell’s Brynhild tie-in project. Responsible for topsides engineering.

May 2011 – Nov. 2012
Client: Argos Terminals BV (Rotterdam)
Position: Project Manager
Project coordination and setting up a project organisation for a newbuild oil terminal for Argos Terminals in Rotterdam.

Feb. 2011 – April 2011
Client: Bumi Armada on behalf of Okeanos
Position: Consultant
Technical review of a FPSO project in Vietnam

March 2010 – September 2010
Client: at SPIE Controlec, Schiedam.
Position: Project manager Part of Shell Prima project. EPCM contract management of GTL import facilities comprising design and construction management.

Feb. 2010 – April 2010
Client: Okeanos
Position: Technical consultant
Review of a new build self-erecting platform project in Canada.

Oc. 2009 – April 2010
Client: Okeanos
Position: Technical consultant
Tender evaluation of the Quad 204 project. Project location KBR in Leatherhead.

Oct. 2009
Client: Versatec Energy
Position: Hazop chairman
TEG regeneration system for Eneco Gasspeicher EPE project (gas storage in salt caverns) in Gronau, Germany.

April – Oct. 2009
Client: SPIE Controlec, Schiedam
Position: Project manager
Design of the RotAn pipeline between Rotterdam and Antwerp for Vitol (VTTI).

Jan. – April 2009
Client: Dockwise Shipping BV
SSFDR Floatovers project Main project deliverables: project execution plan, quality plan, work descriptions.

Oct. 2008
Client: Bluewater Energy Services BV
Position: Project Engineer Topsides
Ithaca ‘Athena’ field development.
Position: Tender concept manager Deployment of the ‘Uisge Gorm’ in Iran.

May – Oct. 2008
Client: Total E&P NL BV
Supervison of installation and (pre-)commissioning of the pipeline installation and platform modifications of K6C and K6N.

March – April 2008
Client: Okeanos
Position: Technical consultant
Review on technical risks of large new build semi-submersible for the GOM.

Jan – Feb 2008
Client: Okeanos
Position: Technical consultant
Review on technical risks of a new build FPSO for the North Sea.

Home
Account
Cart
Search